Glossary entry (derived from question below)
français term or phrase:
effort de poussée
anglais translation:
stress, load
Added to glossary by
cc in nyc
Feb 6, 2011 03:41
13 yrs ago
7 viewers *
français term
effort de poussée
français vers anglais
Technique / Génie
Construction / génie civil
Lease agreement
Hello,
I'm looking for the US term for the above entry which is found in contex5 below under the heading of
'Interior build out work' and right after these 2 sentences:
"Les fixations au plancher haut ou toiture se font exclusivement dans les éléments porteurs selon des principes qui doivent être approuvés par le bureau de contrôle.
Le spittage est interdit."
"Aucun effort de poussée ne doit être appliqué aux poteaux de l’ossature et murs latéraux.
Thanks so much for any help on this one.
Regards,
Richard
I'm looking for the US term for the above entry which is found in contex5 below under the heading of
'Interior build out work' and right after these 2 sentences:
"Les fixations au plancher haut ou toiture se font exclusivement dans les éléments porteurs selon des principes qui doivent être approuvés par le bureau de contrôle.
Le spittage est interdit."
"Aucun effort de poussée ne doit être appliqué aux poteaux de l’ossature et murs latéraux.
Thanks so much for any help on this one.
Regards,
Richard
Proposed translations
(anglais)
2 | stress | cc in nyc |
4 +3 | horizontal loads | Richard Hedger |
3 +2 | thrust | Simon Cole |
2 -1 | push force | Marco Solinas |
Change log
Feb 11, 2011 04:14: cc in nyc Created KOG entry
Proposed translations
3 heures
Selected
stress
Perhaps: "No stress should be applied..."
But others may have better solutions.
--------------------------------------------------
Note added at 10 hrs (2011-02-06 14:35:19 GMT)
--------------------------------------------------
After seeing the additional context in Discussion, perhaps: No load shall be placed on...
But others may have better solutions.
--------------------------------------------------
Note added at 10 hrs (2011-02-06 14:35:19 GMT)
--------------------------------------------------
After seeing the additional context in Discussion, perhaps: No load shall be placed on...
Note from asker:
Hello CC, thanks for your suggestion. |
4 KudoZ points awarded for this answer.
Comment: "Thank you CC in NYC"
-1
21 minutes
push force
Note from asker:
Hi Marco thank you for your help. |
Peer comment(s):
disagree |
B D Finch
: The patent is poorly translated from French and not related to construction. "Push force" is not an appropriate term for the present context.
6 heures
|
+3
4 heures
horizontal loads
Difficult to tell from the context but term "effort de poussée" is generally used to discribed the lateral or horizontal forces from earth behind retaining wall structures.
My structural engineering background is telling me that your columns and walls are only designed to resist vertical loading from the rest of the building.
My structural engineering background is telling me that your columns and walls are only designed to resist vertical loading from the rest of the building.
Note from asker:
Hello Again Richard. Thanks for your input. |
Peer comment(s):
agree |
Bourth (X)
: Yes. Even if they have a diagonal strut against a wall or column, it will have a horizontal component.
3 heures
|
agree |
Jennifer Levey
5 heures
|
agree |
cc in nyc
7 heures
|
+2
4 heures
thrust
When constructing the upper floor (ceiling) and roof, they don't want any thrust (be it vertical or horizontal) applied to the side walls or framework structure (skeleton) of the building, but only to the designated load-bearing elements, which will have been appropriately calculated to meet the demands expected of them.
Note from asker:
Thanks for your help Simon. |
Peer comment(s):
agree |
B D Finch
1 heure
|
agree |
pooja_chic
2 heures
|
neutral |
Jennifer Levey
: Strictly speaking, 'thrust' relates to dynamic systems; the source text refers to static conditions.
5 heures
|
neutral |
cc in nyc
: "thrust" is Google Translate's solution ;-)
6 heures
|
maybe it is right sometimes :-))
|
Discussion
'Aménagements intérieurs'
Le Preneur remet au Bailleur, lors du dépôt de son dossier d’aménagement et en tout état de cause avant la date de démarrage des travaux, les plans d’exécution cotés et détaillés faisant ressortir toutes les indications relatives aux aménagements, à la décoration intérieure du Local, aux enseignes, avec plans, coupes, élévations et croquis respectifs.
Les fixations au plancher haut ou toiture se font exclusivement dans les éléments porteurs selon des principes qui doivent être approuvés par le bureau de contrôle.
Le spittage est interdit.