Niveau Brut Après Recépage

English translation: (unfinished) cut-off level

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
French term or phrase:Niveau Brut Après Recépage
English translation:(unfinished) cut-off level
Entered by: Bashiqa

12:38 Mar 29, 2017
French to English translations [PRO]
Tech/Engineering - Construction / Civil Engineering / Wall design
French term or phrase: Niveau Brut Après Recépage
Context:
D’une façon générale, le béton sera coulé avec une garde suffisante au-dessus du Niveau Brut Après Recépage (N.B.A.R) de sorte à pouvoir éliminer par recépage la hauteur de béton polluée par la bentonite et la laitance.

Pouring concrete for diaphragm walls.
Suggestions please.
TIA Chris.
Bashiqa
France
Local time: 17:16
(unfinished) cut-off level
Explanation:
www.fps.org.uk/fps/guidance/pilingspec/pilingspec_breakingdown.phpBored cast in place concrete piles should always be cast to a level above the specified cut-off such that, after trimming, a sound concrete connection with the pile ...

Selected response from:

B D Finch
France
Local time: 17:16
Grading comment
Thank you.
4 KudoZ points were awarded for this answer



Summary of answers provided
4(unfinished) cut-off level
B D Finch
3structural level after cutting off
Giuseppe Donnangelo


  

Answers


3 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
structural level after cutting off


Explanation:
structural (floor) level after cutting off
It's just an idea!

Niveau brut:
https://nguyenvanbinhpontsetchaussees.files.wordpress.com/20...

Recépage
https://books.google.ie/books?id=nBdX0BGBEvwC&pg=PA1038&lpg=...
page 23

Giuseppe Donnangelo
Ireland
Local time: 16:16
Specializes in field
Native speaker of: Native in ItalianItalian
PRO pts in category: 8
Login to enter a peer comment (or grade)

4 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
(unfinished) cut-off level


Explanation:
www.fps.org.uk/fps/guidance/pilingspec/pilingspec_breakingdown.phpBored cast in place concrete piles should always be cast to a level above the specified cut-off such that, after trimming, a sound concrete connection with the pile ...



B D Finch
France
Local time: 17:16
Specializes in field
Native speaker of: English
PRO pts in category: 915
Grading comment
Thank you.
Notes to answerer
Asker: Thank you.

Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search